Your spreadsheet
becomes the timeline.

Paste your dates. Get a Gantt chart that updates itself. No reformatting. No rebuilding. Ever.

Free · No sign-up · Runs in your browser
Your Data
ProjectStartEnd
Brand Refresh2026-01-062026-03-15
Platform Build2026-02-102026-05-20
Market Launch2026-04-012026-06-30
TimelineLive
Jan
Feb
Mar
Apr
May
Jun
Today
Brand Refresh
Platform Build
Market Launch
Change the dates — the chart follows

How it actually works

1

Keep your spreadsheet

Paste data from Excel. No migration, no new format to learn. Your spreadsheet is the source of truth.

2

Timeline stays current

Change a date, the chart updates. No dragging boxes. No broken formatting. The timeline matches the data.

3

Compare any two versions

Upload last quarter and this quarter. See what slipped, what accelerated, and by how much. Instantly.

Live UpdatesReal-time
2026-04-19

Edit a date — bars move instantly

Change a date.
Chart updates itself.

Edit a cell in the spreadsheet and watch the Gantt chart redraw instantly. No manual refresh, no broken links, no re-export.

  • Instant visual feedback
  • No manual refresh needed
  • Walk into meetings with current timelines
See full example
Schedule ComparisonQ3 → Q4
JanFebMarAprMayJun
Platform Migration+45d
Mobile App Launch-12d
Data Warehouse+8d
Marketing Campaign+32d
API Integration-5d
Baseline (Q3)
Postponed
Accelerated

What slipped?
Answer in seconds.

Upload two schedule versions. See every change color-coded and quantified — what moved, by how much, and which projects drifted the most.

  • Automatic project matching
  • Postponed vs accelerated at a glance
  • Impact ranked by magnitude
See full example
.png
Presentations & Slack
Pixel-perfect for screens
.svg
Posters & reports
Crisp at any scale
.pptx
PowerPoint slides
With your brand template

One click.
Any format.

Export your Gantt chart to PNG for presentations, SVG for crisp scaling at any size, or PPTX for PowerPoint. No screenshots, no cropping.

  • PNG for Slack, email, presentations
  • SVG for posters, reports, large formats
  • PPTX with your brand template
See full example
Dependency Cascade
Watch the cascade
JanFebMarApr
Requirements
+0d
Design
+0d
Development
+0d
Testing
+0d
Launch
+0d

Drag one activity — dependents follow automatically

Drag one.
Align everything.

Move a task and watch downstream dependencies shift automatically. One drag cascades through the entire chain — no manual updates.

  • Automatic cascade to dependents
  • Visual delta badges show shift
  • No circular reference nightmares
See full example
Built by a strategy professional who was tired of rebuilding charts every Monday.

Born from real portfolio management — not a feature spec.


One plan. Everything unlocked.

Use it free in your browser — or unlock cloud storage, team collaboration, and branded exports.

Recommended
Team Plan
For teams who need more than a browser tab
€29/ month
or €290/year — save 17%
Start Team Plan
Cancel anytime. No lock-in.
Everything included
  • Secure cloud storage
  • Multi-device access
  • Up to 10 team members
  • PowerPoint brand templates
  • Brand colors on every export
  • Change tracking
  • Unlimited cloud schedules
  • Migrate your local data
Free plan
Up to 5 cloud schedules. No credit card needed.
Sign Up Free

Frequently asked

Nope. Keep your data wherever it lives now (Excel, Sheets, etc.). Just import it when you need a timeline. We're a visualization layer, not a data silo.

Any spreadsheet format works — Excel (.xlsx, .xls), CSV, or just copy-paste directly from Google Sheets. If it has dates in columns, we can visualize it.

Not really. If you can use Excel, you can use this. Most users create their first presentation-ready timeline within 5 minutes.

Upload two versions of the same schedule. We overlay them and highlight every change — what slipped, what accelerated, what was added or removed. Color-coded and quantified.

Yes. One-click export to PNG for presentations, SVG for crisp scaling at any size, or PPTX with your brand template. Ready to drop into slides, reports, or print.

The core product is free with no signup required. Your data stays in your browser. Premium features like cloud sync, team sharing, and branded exports are available on the Team plan.

Absolutely. Start with the free plan, upgrade to Team whenever you're ready. Your schedules and settings carry over seamlessly — no re-setup required.

Yes. Free users keep data locally on their device. Team plans use encrypted cloud storage with row-level security — your data is isolated to your workspace and inaccessible to anyone else.

Your data stays safe. After your billing period ends, your workspace becomes read-only — you can still view and export everything, but can't create new cloud schedules. Re-subscribe anytime to pick up where you left off.

All major credit cards, debit cards, and Apple Pay through Stripe. For enterprise invoicing or purchase orders, reach out to our team.

We're here. Comprehensive docs, video tutorials, and a responsive support team. You're never stuck building a timeline alone.

Always current.
Zero effort.

Free. In your browser. No sign-up required.