Your spreadsheet
becomes the timeline.
Paste your dates. Get a Gantt chart that updates itself. Now with an AI assistant that builds and edits your timeline for you.
| Project | Start | End |
|---|---|---|
| Brand Refresh | 2026-01-06 | 2026-03-15 |
| Platform Build | 2026-02-10 | 2026-05-20 |
| Market Launch | 2026-04-01 | 2026-06-30 |
How it actually works
Keep your spreadsheet
Paste data from Excel. No migration, no new format to learn. Your spreadsheet is the source of truth.
Timeline stays current
Change a date, the chart updates. No dragging boxes. No broken formatting. The timeline matches the data.
Compare any two versions
Upload last quarter and this quarter. See what slipped, what accelerated, and by how much. Instantly.
Keep your spreadsheet
Paste data from Excel. No migration, no new format to learn. Your spreadsheet is the source of truth.
Timeline stays current
Change a date, the chart updates. No dragging boxes. No broken formatting. The timeline matches the data.
Compare any two versions
Upload last quarter and this quarter. See what slipped, what accelerated, and by how much. Instantly.
Describe it.
The AI drafts it.
- Build from a sentence or a spreadsheet. Describe the plan, or drop in a messy spreadsheet — the AI drafts a structured timeline.
- Edit by asking. "Push phase 2 two weeks," "add a QA milestone," "group by workstream."
- You approve every change. The AI proposes; nothing is applied to your schedule without your click.
Real AI on the free plan — no credit card.
Drafted in seconds — accept in one click
Edit a date — bars move instantly
Change a date.
Chart updates itself.
Edit a cell in the spreadsheet and watch the Gantt chart redraw instantly. No manual refresh, no broken links, no re-export.
- Instant visual feedback
- No manual refresh needed
- Walk into meetings with current timelines
What slipped?
Answer in seconds.
Upload two schedule versions. See every change color-coded and quantified — what moved, by how much, and which projects drifted the most.
- Automatic project matching
- Postponed vs accelerated at a glance
- Impact ranked by magnitude
One click.
Any format.
Export your Gantt chart to PNG for presentations, SVG for crisp scaling at any size, or PPTX for PowerPoint. No screenshots, no cropping.
- PNG for Slack, email, presentations
- SVG for posters, reports, large formats
- PPTX with your brand template
Drag one activity — dependents follow automatically
Drag one.
Align everything.
Move a task and watch downstream dependencies shift automatically. One drag cascades through the entire chain — no manual updates.
- Automatic cascade to dependents
- Visual delta badges show shift
- No circular reference nightmares
Built by a strategy professional who was tired of rebuilding charts every Monday.
Born from real portfolio management — not a feature spec.
One plan. Everything unlocked.
Use it free — now with an AI assistant on every plan — or unlock more schedules, team collaboration, version history, and branded exports.
- AI assistant — 200 messages/day
- Secure cloud storage
- Multi-device access
- Up to 10 team members
- PowerPoint brand templates
- Brand colors on every export
- Change tracking
- Unlimited cloud schedules
- Migrate your local data
Frequently asked
Yes. Every plan includes the AI assistant — no credit card needed. The free plan covers up to 10 AI messages a day; the Team plan raises that to 200 a day per person.
Two things, today: it builds a draft schedule from a sentence or an uploaded spreadsheet, and it edits an existing one when you ask ("push phase 2 two weeks," "add a QA milestone"). Every change is proposed for you to approve — nothing is applied automatically.
No. Your schedule data is sent to the AI only to answer your request, and it is not used to train any model.
Nope. Keep your data wherever it lives now (Excel, Sheets, etc.). Just import it when you need a timeline. We're a visualization layer, not a data silo.
Any spreadsheet format works — Excel (.xlsx, .xls), CSV, or just copy-paste directly from Google Sheets. If it has dates in columns, we can visualize it.
Not really. If you can use Excel, you can use this. Most users create their first presentation-ready timeline within 5 minutes.
Upload two versions of the same schedule. We overlay them and highlight every change — what slipped, what accelerated, what was added or removed. Color-coded and quantified.
Yes. One-click export to PNG for presentations, SVG for crisp scaling at any size, or PPTX with your brand template. Ready to drop into slides, reports, or print.
The core product is free — no credit card needed, with up to 3 cloud schedules saved to your account. The Team plan adds more seats, version history, team collaboration, and branded exports.
Absolutely. Start with the free plan, upgrade to Team whenever you're ready. Your schedules and settings carry over seamlessly — no re-setup required.
Yes. Your schedules are saved to encrypted cloud storage, isolated to your workspace and inaccessible to anyone else.
Your data stays safe. After your billing period ends, your workspace becomes read-only — you can still view and export everything, but can't create new cloud schedules. Re-subscribe anytime to pick up where you left off.
All major credit cards, debit cards, and Apple Pay through Stripe. For enterprise invoicing or purchase orders, reach out to our team.
We're here. Comprehensive docs, video tutorials, and a responsive support team. You're never stuck building a timeline alone.